CorePreCon

Civil construction estimating

Wet utility estimating,
built for bid day.

From quantity takeoff to turnkey costing for civil contractors and bid teams.

Illustrative site image

Services by trade

Underground Utility (Wet)

Know what’s in the ground, what it takes to install, and what belongs in your bid.

See estimating deliverables
  • Water

    Mains, services, valves, hydrants, fittings, and tie-ins.

  • Sanitary sewer

    Gravity mains, laterals, manholes, and connections to existing systems.

  • Storm drainage

    Storm pipe, culverts, catch basins, inlets, and outlet structures.

Estimate deliverables

From plans to pricing.

Get the quantities for your own pricing or a cost build-up for the full agreed trade scope.

Quantity takeoff

  • Pipe lengths by system, size, and material
  • Counts for structures, fittings, valves, and appurtenances
  • Trench, bedding, backfill, and restoration quantities as scoped

Turnkey costing

  • Labor, equipment, material, and subcontract cost build-up
  • Crew and production assumptions tied to the work
  • Scope qualifications and open items to review before bid day

How it works

A clear path to bid day.

  1. Share the project

    Send the project location, bid date, and wet utility scope you want covered.

  2. Confirm the scope

    We align on the plans and addenda, deliverable, exclusions, and schedule.

  3. Review the estimate

    Work through quantities, costing, and open items before you finalize the bid.

Project inquiry

What are you bidding?

Tell us about your project and what you need priced. We’ll follow up about the scope, timing, and how to share plans.

Include your bid date if it’s set. Keep bid documents and confidential pricing out of this initial request.

We use this information to respond to your request.